Home > Services > Kitchen Remodeling > Countertop Installation

Countertop Installation in Houston, TX

Maybe your laminate is chipped, your old granite is stained and dated, or your new cabinets are sitting there waiting for tops. Whatever brought you here, you want countertops that fit tight to the wall, sit dead level, and don’t turn into a month of phone calls between three different companies. Brito Remodel & Construction handles kitchen countertop installation for Houston homeowners, from quartz and granite to quartzite, marble, and porcelain. Countertop work is a core part of our kitchen remodeling in Houston services.

Most countertop companies cut stone and set it. That’s where their job ends. As part of our Houston home remodeling work, we handle the whole job: checking and leveling your cabinets, removing the old tops, disconnecting and reconnecting your sink, setting the new countertops, and cleaning up. Send us a few photos of your kitchen, and we’ll call with a ballpark figure before we ever visit.

✔ One Project at a Time   ✔ Owner On-Site From Template to Install   ✔ Your Final Bill Matches Your Estimate  

✔ 5.0 on Google   ✔ Family-Run Since 2014   ✔ Licensed & Insured

Brito Remodel and Construction company logo

Get Your Free Quote

Fill out the form below and we’ll contact you within 24 hours to confirm.

Countertop Installation in Houston at a Glance

Who we are

Brito Remodel & Construction is a family-run, residential remodeling company serving Houston homeowners since 2014, with the owner directly involved in each project.

What we install

We install quartz, granite, quartzite, marble, porcelain, butcher block, solid surface, and laminate countertops, along with islands, waterfall edges, sinks, and backsplashes.

What's included

Our countertop projects can include cabinet checking and leveling, templating, fabrication coordination, old countertop removal, plumbing disconnect and reconnect, installation, sealing, and cleanup.

How we work

We keep the process focused on your project, with the owner involved from the template visit through installation to help keep the work coordinated and on track.

Typical timeline

After templating, fabrication typically takes 5–14 days. Once the countertops are ready, installation is usually completed in one day.

Where

We serve homeowners throughout Houston and nearby communities, including Houston Heights, Montrose, Midtown, Rice Village, West University Place, Bellaire, Memorial and the Villages, Briar Forest, Westchase, and Spring Branch West.

One Contractor Template to Install

A countertop job touches more trades than most people expect: cabinets, stone, plumbing, sometimes electrical and tile. When those pieces are split between different companies, the gaps between them are where things go wrong.

Why Countertop Jobs Go Wrong

With many big-box and slab-yard jobs, one company measures, another cuts the stone, and a third crew installs it. Nobody owns the whole result. That’s how you end up with:

  • A countertop cut to the wrong size, or one that doesn’t account for the plywood under the old top
  • A missing cutout for a pop-up outlet or faucet
  • No plan for support under heavy stone or an island overhang
  • An install crew showing up hours late, with no one to call who knows your job
  • Debris left in your cabinets, yard, or driveway

What We Handle That Fabricators Usually Don't

Fabricators cut and set stone. Everything around the stone is usually up to you. We take care of it:

  • Cabinet check, leveling, and support before templating, including corbels or brackets for overhangs
  • Old countertop removal and haul-away
  • Plumbing disconnect and reconnect for your sink, faucet, garbage disposal, and dishwasher
  • Cooktop and outlet coordination, so cutouts are planned before the stone is cut
  • Backsplash, in slab or tile
  • Daily cleanup and a clean kitchen at the end

The Owner On-Site for Template and Install Day

We take on one project at a time, and the owner is on-site for the moments that matter most: the cabinet check, the template visit, and install day. If a wall is out of square or a seam needs to move, the person who can make the call is standing in your kitchen.

Countertop Installation Services We Offer in Houston

From a single island top to a full kitchen of new stone, here’s what we install.

Countertop Replacement

Full Countertop Replacement

We remove your old countertops, check the cabinets underneath, and install new ones from template to final seal. Replacement is also the right time to fix what bothered you about the old tops, like a seam in the wrong spot, an overhang that’s too shallow for stools, or a backsplash that never matched.

New Countertops

New Countertops in a Kitchen Remodel

When countertops are part of a bigger remodel, we schedule them in the right order: cabinet installation in Houston comes first, with cabinets installed and leveled before templating, then countertops, then backsplash. Keeping the work in the right sequence helps prevent delays and makes sure each trade has what it needs before the next step begins.

Kitchen Islands

Kitchen Islands and Waterfall Edges

Islands often need the largest slab in the kitchen, careful seam planning, and support for seating overhangs. A waterfall edge carries the stone down the side of the island to the floor, with the veining matched across the corner.

Sinks and Cutouts

Sinks & Cutouts

Every cutout is planned before the stone is cut:

  • Undermount sinks, with a polished edge and secure mounting
  • Farmhouse (apron-front) sinks, with the cabinet adjusted to fit
  • Cooktop and range cutouts sized to your appliance’s specs
  • Faucet, soap dispenser, and filtered-water holes
  • Pop-up outlets on islands

Bring your sink and appliance model numbers to the template visit, or send them ahead of time, so the cutouts match exactly.

Slab and Tile Backsplashes

A slab backsplash continues your countertop up the wall, from a short 4-inch splash to full height, for a seamless look. A tile backsplash adds pattern and color, and tile installation can bring that same durable finish to your kitchen walls and floors. Either way, the backsplash goes in after the countertops are set.

Old Countertop Removal and Haul-Away

We remove and dispose of your old countertops as part of the job. Once they’re off, we check the cabinet tops for water damage, especially around the sink, before anything new goes on.

Signs It's Time to Replace Your Countertops

It’s time for new countertops when the surface is damaged, the layout no longer works, or the countertop is holding back the rest of your kitchen. These are the signs we see most in Houston kitchens:

  • Chips, cracks, or peeling laminate at edges and seams
  • Stains or etching that won’t come out of older stone
  • Water damage at the sink, where laminate swells or the cabinet underneath has softened
  • Seams that have separated or sit unevenly
  • Not enough prep space, or no seating at the island
  • A dated color or pattern that clashes with everything else
Countertop Replacement 2

Can I Replace Countertops Without Replacing Cabinets?

Usually, yes, if your cabinets are solid, level, and can support the weight of stone. We check every cabinet before templating. Sometimes a base cabinet needs to be re-leveled, reinforced, or repaired after an old leak. If your cabinets are failing or you want a new layout, it’s better to replace both together, and cabinet installation can be coordinated with the countertop project.

Countertop Materials We Install

The right countertop depends on how you cook, how much upkeep you want, and the look you’re after. These are the materials we install most.

Quartz

Quartz is engineered stone: crushed quartz bound with resin. It’s non-porous, so it resists stains and never needs sealing, and it comes in consistent colors and marble-look patterns. It’s the most requested countertop in Houston kitchens. Keep hot pans off it with a trivet, since high heat can damage the resin.

Granite

Granite is natural stone, so every slab has its own pattern. It handles heat well and is very durable, but it needs periodic sealing to resist stains. Entry-level granite is often one of the most affordable stone options.

Quartzite

Quartzite is a natural stone that often looks like marble but is much harder. It resists heat and scratching and is less likely to etch than marble. Like granite, it needs sealing, and premium slabs cost more than most quartz.

Marble

Marble has a soft, classic veining that nothing else quite matches. It’s also softer and more porous, so it can etch from lemon juice, wine, or vinegar and needs regular sealing. It’s best for homeowners who like the look of stone that ages and shows its use.

Porcelain and Sintered Stone

Porcelain and sintered stone slabs are dense, non-porous, and very resistant to heat, stains, and fading. They come in large slabs with marble or concrete looks. Thinner slabs need careful templating and handling, so experience with the material matters.

Butcher Block, Solid Surface, and Laminate

We also install butcher block, solid surface, and laminate countertops. Butcher block adds warmth on an island, solid surface gives a seamless, repairable finish, and laminate keeps costs down for laundry rooms or rentals.

Quartz vs. Granite for a Houston Kitchen

Quartz is the easier choice if you want low maintenance and a consistent look. Granite is the better choice if you want one-of-a-kind natural stone that handles heat well and you don’t mind sealing it. Both are durable and can fall into a similar price range. For a more detailed comparison, read our quartz vs. granite: which is better? guide.

How the materials compare:

Material

Sealing

Heat

Stains

Etching

Look

Quartz

Never

Use trivets

Very resistant

Very resistant

Consistent patterns

Granite

Periodic

Excellent

Good when sealed

Resistant

Unique natural patterns

Quartzite

Periodic

Excellent

Good when sealed

Resistant

Marble-like natural stone

Marble

Regular

Good

Can stain

Etches easily

Classic soft veining

Porcelain

Never

Excellent

Very resistant

Very resistant

Large slabs, many looks

Butcher block

Oiling

Use trivets

Can stain

Not applicable

Warm wood

Edge Profiles, Thickness, and Overhangs

Edges and thickness change how a countertop looks and feels more than most people expect.

Edge profiles

An eased (slightly softened square) edge is clean and modern. Bevel, bullnose, and ogee edges add more detail. A mitered edge makes the slab look thicker by joining a strip to the front edge.

Thickness

3 cm slabs (about 1¼ inches) are standard for kitchens and need no extra support along the cabinets. 2 cm slabs (about ¾ inch) are lighter and cost less, but usually need a plywood subtop or a built-up edge.

Overhangs

An island seating overhang typically needs hidden steel supports or corbels beyond a certain depth, depending on the material and slab thickness. We plan support before templating, not on install day.

How We Install Your Countertops

Every countertop installation, from a single vanity-size piece to a full kitchen of stone, moves through the same stages. Each one sets up the next.

Cabinet Check: Level, Secure, and Supported

The countertop is only as good as the cabinets under it. Before templating, we check every base cabinet for level and make sure each one is fastened to the wall. We shim or reinforce where needed and add support for overhangs, dishwashers, and sink bases.

Templating

Once the cabinets are ready, the fabricator templates the exact shape of your countertops: walls, corners, sink and cooktop locations, and overhangs. We’re there for the template visit to confirm seam locations, overhang depths, faucet holes, and outlet cutouts with you.

Slab Layout and Seam Placement

For natural stone, the template is laid over your actual slab so you can decide where the veining falls and where any seams go. We aim to keep seams out of high-traffic spots and away from the sink.

Fabrication

We coordinate fabrication with a trusted local fabrication shop, where the slab is cut, edged, and polished to the template. Cutouts for the sink, cooktop, and faucet are made in the shop, not in your kitchen.

Tear-Out and Plumbing Disconnect

On install day, or just before it, we disconnect the sink, faucet, garbage disposal, and dishwasher, then remove the old countertops. We check the cabinet tops for any damage the old countertops were hiding.

Setting, Seaming, and Sealing

The new countertops are carried in, set, leveled, and fastened. Seams are joined, color-matched, and smoothed. Natural stone like granite, quartzite, and marble is sealed.

Sink, Faucet, and Cooktop Reconnection

We reconnect the plumbing and check for leaks, then confirm the dishwasher is secured and the cooktop sits correctly in its cutout.

Backsplash and Final Cleanup

A slab backsplash goes in after the countertops. A tile backsplash follows after that. We clean the kitchen and walk you through how to care for your new countertops.

Important Considerations Before You Replace Countertops

Order of Work: Cabinets, Template, Countertops, Backsplash

Countertops can only be templated after cabinets are fully installed, level, and secured. Countertops then go in before the backsplash. If you’re replacing cabinets and countertops together, we schedule each step so nothing waits on a missing piece.

Changes After Templating Restart Fabrication

Moving the sink, changing the edge profile, adding a cutout, or switching material after templating usually means a new template and a new spot in the fabrication schedule. Make your final decisions before the template visit. We’ll walk through every detail with you so nothing gets missed.

Support for Heavy Stone and Island Overhangs

Stone is heavy. Base cabinets need to be solid and level, and seating overhangs beyond a certain depth need hidden steel supports or corbels. We plan for it before templating, so it isn’t discovered on install day.

What "Installed" Prices Often Leave Out

Many per-square-foot prices include only the material, fabrication, and installation. Tear-out, plumbing, sink and cooktop cutouts, edge upgrades, and backsplash are often extra. When you compare quotes, ask what each one includes. Our itemized estimate lists every one of these.

Questions to Ask Before You Hire a Countertop Installer

Whoever you hire, these questions separate a smooth install from a costly redo:

  • Who templates, who fabricates, and who installs?
    Brito handles the template and installation, while fabrication is coordinated as part of the project. Ask who is responsible if measurements or fabrication are incorrect.
  • Where will the seams fall?
    Ask to see the planned seam locations before fabrication so you know where they will be and how they will look.
  • What does the quote include?
    Make sure the quote clearly lists tear-out, plumbing, sink cutouts, edge details, backsplash, sealing, and haul-away so there are no surprises later.
  • Who checks that the cabinets are level and can support stone?
    The cabinets should be checked and leveled before templating. This helps ensure the countertops have a proper, stable base.
  • Who disconnects and reconnects the sink, disposal, and dishwasher?
    Ask whether plumbing disconnects and reconnects are included in the project or handled separately. Brito coordinates this work as part of the countertop installation when needed.
  • What’s the timeline from template to install, and what happens if a date slips?
    Brito typically allows 5–14 days for fabrication after templating, with installation usually taking one day. Ask what happens if fabrication or another part of the project causes a delay.
  • What warranty covers the installation work?
    Ask for the installation or workmanship warranty in writing, including what is covered and how long the coverage lasts.
  • Is the company licensed and insured?
    Brito Remodel & Construction is licensed and insured. You should still ask any contractor for confirmation of their current coverage before work begins.

We answer every one of these in writing, in your itemized estimate.

Houston-Specific Considerations

Houston homes bring a few conditions we plan around on every countertop installation

Slab foundations that have shifted

Many Houston homes sit on slabs that have settled over the years, leaving cabinets out of level. Stone won't flex to match, so we level the cabinets before templating.

Humidity and natural stone

Granite, quartzite, and marble need to be sealed properly and resealed on schedule, especially around the sink.

Older kitchens in the Heights and Montrose

Out-of-square walls and uneven floors mean more careful templating and scribing at the backsplash.

Hidden water damage

We often find softened cabinet tops around old sinks, and we repair them before new stone goes on.

Our Process

Our Countertop Installation Process

We walk every homeowner through the same clear process, from your first photos to the final seal.

Photo Review

Send us a few photos and the basics (see the box below). That tells us most of what we need for a realistic ballpark before anyone visits.

Phone Consultation & Ballpark Figure

We call to talk through the material you’re considering, the edges, the sink, and any backsplash, then give you a ballpark figure for your kitchen.

In-Home Consultation

We measure your counters, check your cabinets for level and support, look under the sink, and confirm appliance and plumbing locations. Many homeowners have us out the very next day.

Detailed Estimate

You’ll receive a clear, itemized estimate before any work begins. Material, fabrication, installation, tear-out, plumbing, cutouts, edges, and backsplash each get their own line. Your final bill matches your estimate. Nothing gets added without your written approval.

Material Selection

We help you choose the material, color, edge, and thickness. For natural stone, you can pick your exact slab. You can also choose a slab yourself at a Houston stone yard, and we’ll handle the rest.

Construction

We prep the cabinets, attend the template visit, coordinate fabrication, then remove the old tops, set the new countertops, and reconnect your plumbing. The owner is on-site for the template and install day.

Final Walkthrough

We check every seam, edge, and cutout with you, run the faucet, and fix anything that isn’t right.

Warranty & Support

Our relationship doesn’t end when we leave. We stand behind our work, and we’re here if a question comes up later.

What to send for a fast ballpark

Photos

Send photos of your current countertops, the cabinets underneath, and inside the sink base. A few clear views of the full kitchen help us understand the existing setup.

Rough Lengths

Measure the length of each countertop run and send the numbers. A quick phone sketch showing the layout and measurements is perfectly fine.

Your Preferred Material

Tell us what you want, such as quartz, granite, or another material. Not sure yet? Just say “not sure yet” and we can discuss the options.

Your ZIP Code

Include your ZIP code so we can confirm the project location and service area.

Cabinet Status

Let us know whether you're keeping the existing cabinets, replacing them, or already have new cabinets installed. This helps us understand what needs to happen before templating.

Countertop Installation Cost in Houston

The cost of countertop installation in Houston depends mostly on how many square feet you need, which material and slab you choose, and how much work happens around the stone, like tear-out, plumbing, and cabinet prep. Every kitchen is different, so we don’t publish a one-size-fits-all price. After seeing your kitchen, we give you an itemized estimate that shows exactly what you’re paying for.

Material + Fabrication + Installation: What a Quote Should Include

An “installed” price usually covers the slab, fabrication, and setting the countertops, but often not tear-out, plumbing, cutouts, or backsplash. That’s why two quotes for the same kitchen can look very far apart. Our itemized estimate shows every line, so you can compare honestly.

What Drives the Cost

  • Total square feet, including the island and any backsplash in stone
  • Material and slab grade
  • Edge profile and thickness
  • Number of seams and the slab layout
  • Sink, cooktop, faucet, and outlet cutouts
  • Old countertop removal and haul-away
  • Plumbing disconnect and reconnect
  • Cabinet leveling, repairs, or overhang supports
  • Backsplash height and material

How Long Does Countertop Installation Take?

Install day itself is usually a single day. The full timeline, from template to finished countertops, typically runs about one to three weeks. Fabrication usually takes 5 to 14 days after the template is approved, depending on the material, edge details, and the shop’s schedule.

Template to Install

Cabinets must be installed and level before templating. Once the template is approved, the countertops are fabricated and scheduled for install. Changes after templating restart the clock, so final decisions come first.

Living Without a Sink for a Day or Two

Between tear-out and reconnection, you may be without a kitchen sink for one to three days. We keep that window as short as possible, and we schedule tear-out as close to install day as we can. Most families plan simple meals and use a bathroom sink for those days.

Why Choose Brito for Countertop Installation

One Project at a Time

We don't juggle a dozen kitchens at once. When your countertops are in progress, they get our full attention from the cabinet check to the final seal.

Your Final Bill Matches Your Estimate

Every cost is itemized up front, including tear-out, plumbing, cutouts, and edges. Nothing gets added without your written approval.

In Your Home the Next Day

After your photos and a quick call, we can often be in your kitchen measuring the very next day.

Licensed, Insured, and Cleaned Daily

Every project is backed by proper licensing and insurance. Floors are protected, dust stays in the kitchen, and the work area is cleaned every day.

Countertop Installation Across Houston

Brito Remodel & Construction is proud to serve homeowners throughout Houston and the surrounding communities, including Bellaire, Spring Valley Village, Briar Forest, Bunker Hill Village, Montrose, Lazybrook, West University Place, Hedwig Village, Westchase, Timbergrove, Houston Heights, Hunters Creek Village, Spring Branch West, Memorial Village, Midtown, and Rice Village. Wherever you’re located, our team brings the same owner-supervised, detail-focused approach to every residential project.

Don’t see your neighborhood listed? Contact us – we likely still serve your area.

Related Services

Upgrade your countertops to refresh your kitchen, or explore Bathroom Remodeling in Houston for countertop and vanity upgrades that improve your bathroom’s style and functionality.

Kitchen Remodel Houston

Kitchen Remodeling

Improve the layout, storage, and finishes of your space with Kitchen Remodeling tailored to how your household uses the kitchen.

Kitchen Cabinets

Cabinet Installation

Replace outdated storage with Kitchen Cabinets selected and fitted to your kitchen’s layout, style, and everyday needs.

Tile Flooring Installation Houston

Tile Installation

Create a durable, easy-to-clean surface with Tile Flooring suited to kitchens, bathrooms, entryways, and other areas of the home.

Crown Molding

Crown Molding

Add architectural detail and a polished transition between walls and ceilings with Crown Molding fitted to the room’s dimensions.

Custom Built-in Shelving

Custom Built-In Shelving

Turn unused wall space into practical storage with Custom Built-in Shelving designed around your room, layout, and storage needs.

Countertop Installation FAQs

How much does countertop installation cost in Houston?

It depends on your kitchen’s square footage, the material and slab you choose, the edge profile, the number of seams and cutouts, and whether tear-out, plumbing, and backsplash are included. That’s why we price every kitchen individually. After an in-home visit, you get an itemized estimate, and your final bill matches it.

Quotes often cover different things. One may include only the slab, fabrication, and setting the stone, while another includes tear-out, plumbing, cutouts, edges, sealing, and backsplash. Some charge separately for templating or count square footage differently. Ask each company to list every item, then compare line by line. Our itemized estimate does that for you.

Quartz is better if you want low maintenance: it’s non-porous and never needs sealing. Granite is better if you want unique natural stone that handles hot pans well and you don’t mind periodic sealing. In the mid-range, both cost about the same, so the choice usually comes down to look and upkeep.

Usually, yes, if your cabinets are solid, level, and strong enough for stone. We check every cabinet before templating and re-level, reinforce, or repair the ones that need it. If your cabinets are failing or you want a new layout, replacing both together is usually the better plan.

Fabrication typically takes 5 to 14 days after the template is approved, depending on the material, edge details, and shop schedule. Install day itself is usually a single day. Changes after templating restart fabrication, so final decisions on sinks, edges, and cutouts come first.

We do. Many countertop companies don’t handle plumbing, leaving you to hire a plumber before and after install. We disconnect the sink, faucet, disposal, and dishwasher, remove the old tops, and reconnect and leak-check everything after the new countertops are set.

Yes. Before templating, we check that base cabinets are level and solid enough for stone. Seating overhangs beyond a certain depth get hidden steel supports or corbels, depending on the material and thickness. We plan support in advance, so it’s not a surprise on install day.

Yes. If you’ve found the perfect slab at a Houston stone yard, we can coordinate fabrication and installation with it. Let us know the yard, the slab’s name or number, and its size, and we’ll confirm it covers your kitchen before anything is cut.

A finished quartz countertop doesn’t release harmful silica dust during normal household use. The health risk is to fabrication workers who cut and polish engineered stone without proper dust controls, which is why California regulators moved in 2026 toward restricting high-silica engineered stone. If it’s a concern for you, low-silica quartz, granite, quartzite, and porcelain are all good alternatives.

Yes, if you can. The template visit is when final decisions are locked in: seam locations, overhang depths, faucet holes, and outlet cutouts. Changes after templating can delay fabrication and add cost. We’re there too, so you’re not making those calls alone.

Ask who templates, fabricates, and installs, and who’s responsible if a piece is cut wrong. Ask where seams will fall, what the quote includes, who levels the cabinets and handles the plumbing, how long template to install takes, and what warranty covers the work. Get every answer in writing.

Stone fabricators, big-box store programs, and remodeling contractors all install quartz countertops in Houston. Brito Remodel & Construction installs quartz, granite, quartzite, marble, and porcelain countertops across Houston, including the Heights, Bellaire, and Memorial, and handles tear-out, plumbing, and cabinet prep as part of the job.

Big-box programs offer convenience and in-store design help, but the measuring, fabrication, and installation are usually handled by different subcontractors. A local contractor can give you one point of contact from template to install. Whoever you choose, ask who does each step and who fixes it if something is cut wrong.

A fabricator cuts and sets the stone. A remodeling contractor also handles what surrounds it: leveling cabinets, removing old tops, plumbing, backsplash, and coordinating the schedule. If your cabinets are solid and you’ll manage the plumbing yourself, a fabricator may be enough. If you want one team responsible for the whole job, hire a contractor.

Yes. Templating is part of every countertop project we do, and it’s listed in your itemized estimate rather than billed as a surprise fee. We’re there for the template visit, so seam locations, overhangs, and cutouts are confirmed with you before anything is cut.

Stone is usually bought by the full slab, not by the square foot, and templating, cutting, delivery, and installation take similar time on a small job as a large one. For small projects like a bar top or a single run, a remnant (a leftover piece from a larger slab) can be a good option. We’ll tell you if one fits.

A reasonable deposit covers ordering your slab and fabrication, and the balance is paid as the work is completed. Be cautious of anyone asking for most of the price in cash up front or refusing a written contract. We explain our payment schedule in your written estimate.

Two things are covered separately. The manufacturer’s warranty covers defects in the material itself, like quartz. The installation warranty covers the work: seams, cutouts, edges, and how the countertops were set. Ask for both in writing.

With us, there’s one company responsible. We confirm every measurement, seam, and cutout at the template visit, and if a piece doesn’t fit, we handle the fix with the fabricator. You don’t have to sort out who made the mistake between separate companies.

A full-height slab backsplash continues your countertop up the wall for a seamless look with no grout lines to clean. Tile gives you more pattern and color choices and is easier to change later. Both go in after the countertops are set. We’ll show you how each would look in your kitchen.

Ready for Countertops That Fit, Installed by One Accountable Team?

Send us a few photos of your kitchen, rough countertop lengths, and the material you’re considering. We’ll call with a ballpark figure, then come out, often the next day, to measure everything and give you an itemized estimate for your countertop installation in Houston. One project at a time, the owner on-site from template to install. No pressure and no obligation.

Request a Free Quote